Inspection
CAMSHAFT TIMING OIL CONTROL VALVEINSPECTION
1. REMOVE NO.3 TIMING BELT COVER
2. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE
a. Disconnect the oil control valve connector.
b. Remove the bolt, oil control valve and O-ring.
3. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE OPERATION
Connect positive (+) lead from the battery to terminal 1 and negative (-) lead to terminal 2, and check the movement of the valve.
If operation is not as specified, replace the valve.
4. REINSTALL CAMSHAFT TIMING OIL CONTROL VALVE
a. Install a new O-ring to the oil control valve.
b. Install the oil control valve with the bolt.
Torque: 8.0 N.m (80 kgf.cm, 71 in.lbf)
c. Connect the oil control valve connector.
5. REINSTALL NO.3 TIMING BELT COVER
Torque: 8.0 N.m (80 kgf.cm, 71 in.lbf)