FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

System Relay: Testing and Inspection

INSPECTION







1. INSPECT HEATER MAIN RELAY (Marking: HTR RLY) CONTINUITY
If continuity is not as specified, replace the relay.







2. INSPECT MAGNETIC CLUTCH RELAY (Marking: MG CLT RLY) CONTINUITY
If continuity is not as specified, replace the relay.







3. INSPECT No.1 COOLING FAN RELAY (Marking: FAN RLY NO.1) CONTINUITY
If continuity is not as specified, replace the relay.







4. INSPECT No.2 COOLING FAN RELAY (Marking: FAN RLY NO.2) CONTINUITY
If continuity is not as specified, replace the relay







5. INSPECT No.3 COOLING FAN RELAY (Marking: FAN RLY NO.3) CONTINUITY
If continuity is not as specified, replace the relay.