Removal and Installation
REMOVAL1. REMOVE DRIVE BELT
Loosen the drive belt tension by turning the drive belt tensioner clockwise, and remove the drive belt.
2. DISCONNECT RETURN HOSE.
Remove the clip.
NOTICE: Take care not to spill fluid on the A/C compressor rotor.
3. REMOVE PRESSURE FEED TUBE.
Using a spanner (24 mm) to hold the pressure port union, remove the union bolt and gasket.
4. REMOVE PS VANE PUMP ASSEMBLY.
Remove the 2 bolts.
INSTALLATION
1. INSTALL PS VANE PUMP ASSEMBLY.
Torque the 2 bolts.
Torque:
28 mm bolt: 39 Nm (400 kgf-cm, 29 ft. lbs.)
45 mm bolt: 58 Nm (590 kgf-cm, 43 ft. lbs.)
2. CONNECT PRESSURE FEED TUBE
Using a spanner (24 mm) to hold the pressure port union, torque the union bolt with a new gasket.
HINT: Make sure that the stopper of the tube touches the pump housing as shown in the illustration, then torque the union bolt.
Torque: 49 Nm (500 kgf-cm, 36 ft. lbs.)
3. CONNECT RETURN HOSE. Install the clip.
4. INSTALL DRIVE BELT
Loosen the drive belt tension by turning the drive belt tensioner clockwise, and install the belt.
5. BLEED POWER STEERING SYSTEM