FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

On-Vehicle Inspection

1. REMOVE V-BANK COVER

2. Oil Control Valve (Bank 2):
REMOVE INTAKE AIR CONNECTOR PIPE




3. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE RESISTANCE
a. Disconnect the oil control valve connectors.
b. Using an ohmmeter, measure the resistance between the terminals.
Resistance: 6.9-7.9 ohms at 20°C (68°F)
If the resistance is not as specified, replace the valve.
c. Reconnect the oil control valve connectors.

4. Oil Control Valve (Bank 2):
REINSTALL INTAKE AIR CONNECTOR PIPE
5. REINSTALL V-BANK COVER