Combination Meter Assembly
NOTE: For Combination meter sub-assembly testing and inspection, refer to that component.COMBINATION METER INSPECTION
INSPECT COMBINATION METER WIRING CIRCUIT
Disconnect connector A, connector B, connector C and connector D from the combination meter and inspect the connectors on the wire harness side as follows. If circuit is not as specified, inspect the circuits connected to other parts.