Main Relay (Computer/Fuel System): Testing and Inspection
INSPECTION1. Remove engine main relay. (Marking: engine main)
2. Inspect relay continuity.
(a) Check that there is continuity between terminals 1 and 2.
If there is no continuity, replace the relay.
(b) Check that there is no continuity between terminals 3 and 5.
If there is continuity, replace the relay.
3. Inspect relay operation.
(a) Apply battery voltage across terminals 1 and 2.
(b) Using an ohmmeter, check that there is continuity between terminals 3 and 5.
If there is no continuity, replace the relay.
4. Reinstall engine main relay.