Component Inspection
1. REMOVE THROTTLE BODY
2. REMOVE IAC VALVE
- Remove the 4 screws, IAC valve and gasket.
INSTALLATION HINT: Place a new gasket on the throttle body.
INSPECT IAC VALVE OPERATION
- Connect the positive (+) lead from the battery to terminal +B and negative (-) lead to terminal RSC, and check that the valve is closed.
- Connect the positive (+) lead from the battery to terminal +B and negative (-) lead to terminal RSO, and check that the valve is open.
- If operation is not as specified, replace the IAC valve.
IAC VALVE INSTALLATION
INSTALLATION HINT: Installation is in the reverse order of removal.