FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Circuit Opening Relay

Circuit Opening Relay Inspection:





Checking Relay Continuity
- Remove relay.
- Check for continuity between terminal ST and E1.

Desired - Continuity

- Check for continuity between terminal IG and FC.

Desired - Continuity

- Check for continuity between terminal B and FP.

Desired - No continuity

- Replace relay if desired results are not achieved.




Circuit Opening Relay Inspection:





Checking Relay Operation
- Apply battery voltage across relay terminals ST and E1.
- Check for continuity between terminal B and FP.

Desired - Continuity

Circuit Opening Relay Inspection:





- Apply battery voltage across relay terminals IG and FC.
- Check for continuity between terminal B and FP.

Desired - Continuity

- Replace relay if desired results are not achieved.