FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Component Test

Checking Injector Resistance:





Electrical Inspection
- Remove fuel injectors, refer to COMPONENT REPLACEMENT AND REPAIR PROCEDURES.
- Connect ohmmeter across injector terminals.

Desired - 13.4 to 14.2 ohms @ 68°F (20°C)

- Connect ohmmeter between injector body and each terminal.

Desired - No continuity



Injector Testing:





Functional Inspection
- Connect injector to fuel rail with a length of fuel line and suitable adapters.

Installing Jumper:





- Pressurize fuel system by installing a jumper wire between Check Connector terminals +B and FP.

Testing Fuel Injector Operation - Current Applied:





- Place injector over a graduated cylinder.
- Apple battery voltage to injector for 15 seconds.

Desired - 55 to 70 cc/15 seconds
Less than 10cc difference between injectors


- Disconnect battery voltage and inspect injector for leakage.

Desired - One drop per 3 minutes or less

- Remote jumper wire.
- Reinstall injectors.