Installation
2GR-FE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly with the 3 nuts and 2 clips.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the air inlet line tube to the charcoal canister assembly (leak detection pump).
(c) Connect the vent line tube.
(1) Connect the pipe to the fuel tube connector, as shown in A in the illustration. Then push up the retainer to lock the claws, as shown in B in the illustration.
NOTICE:
* Check that there are no scratches or foreign matter around the connected part of the fuel tube connector and pipe before performing this work.
* After connecting the vent line tube, check that the vent line tube is securely connected by pulling the fuel tube connector and pipe.
(d) Connect the purge line hose.
(e) Connect the connector to the charcoal canister assembly (leak detection pump).
2. INSTALL CHARCOAL CANISTER PROTECTOR
(a) Install the charcoal canister protector with the 3 bolts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
3. INSTALL TAIL EXHAUST PIPE ASSEMBLY Installation
4. CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Service Precautions.