Installation
2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE
(a) Install the No. 1 vacuum switching valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve.
(c) Connect the wire harness clamp.
(d) Connect the No. 1 vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL Installation
4. INSTALL ENGINE ROOM SIDE COVER Installation
5. INSTALL ENGINE ROOM SIDE COVER LH Installation