FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE

(a) Install the No. 1 vacuum switching valve with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve.





(c) Connect the wire harness clamp.

(d) Connect the No. 1 vacuum switching valve connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

3. INSTALL COOL AIR INTAKE DUCT SEAL Installation

4. INSTALL ENGINE ROOM SIDE COVER Installation

5. INSTALL ENGINE ROOM SIDE COVER LH Installation