Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Install the light control rheostat with the 2 screws.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation
3. INSTALL NO. 1 SWITCH HOLE BASE Installation
4. INSTALL INSTRUMENT PANEL GARNISH LH Installation