FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Repair Procedures





Inspection

1. Measure the pressure of high pressure line by voltage output between NO.1 and NO.2 terminals




2. Inspect the voltage value whether it is sufficient to be regular value or not.

Voltage =0.00878835 * Pressure + 0.37081095 [PSIA]

3. If the measured voltage value is not specification, replace the A/C pressure transducer.

Replacement

1. Disconnect the negative (-) battery terminal.
2. Recover the refrigerant with a recovery/charging station.
3. Disconnect A/C pressure transducer connector (3P) (A).
4. Remove the A/C pressure transducer(B).





CAUTION:
- Take care that liquid & suction pipe are not bent.

5. Installation is the reverse order of removal.

TORQUE :10 - 12N.m (1.0 - 1.2kgf.m, 7.4 - 8.8lbf.ft)