System Inspection
Engine Control
P2503 No Battery Charge - Inspection/Repair:_:System Inspection
System Inspection
Check Generator circuit
1. Engine starts.
2. Maintain ENG RPM 2,500RPM over 2 minutes.
3. Measure voltage between the battery terminal(+) and the battery terminal(-).
Specification :Approx. 12.5 - 14.7V
4. Is the measured voltage within specification?