W/Harness Inspection
Engine Control
P0049 Turbocharger/Supercharger Turbine Overspeed - Inspection/Repair:_:W/Harness Inspection
Power Circuit Inspection
1. Ignition "OFF".
2. Disconnect RCV Control connector.
3. Ignition "ON" & Engine "OFF".
4. Measure voltage between power terminal of the RCV Control harness connector and chassis ground.
Specification :B+
5. Is voltage within the specification?