Door Unlock Relay
Inspection
Door Unlock Relay
Check for continuity between the terminals.
1. There should be continuity between the No.1 terminals in the I/P-F and No.5 terminals in the I/P-H when power and ground are connected to the No.1 terminals in the I/P-F and No.9 terminals in the I/P-H.
2. There should be no continuity between the No.1 terminals in the I/P-F and No.5 terminals in the I/P-H when power is disconnected.