Component Inspection
P0264 Cylinder 2-Injector Circuit Low
Inspection/Repair - Component Inspection
Component Inspection
1. Check injector resistance
(1) IG "OFF".
(2) Disconnect injector connector.
(3) Measure resistance between terminal 1 and 2 of injector connector. (Component Side)
A. Specification :
(4) Is the measured resistance within specification?
YES
1) Substitute with a known - good ECM and check for proper operation.
If the problem is corrected, replace ECM and go to "Verification of Vehicle Repair" procedure.
CAUTION:
There is a memory reset function on scantool that can erase optional parts automatically detected and memorized by PCM.
Before or after testing PCM on the vehicle, use this function to reuse the PCM on the others
NO
1) Substitute with a known - good injector and check for proper operation.
If the problem is corrected, replace injector and go to "Verification of Vehicle Repair" procedure.