Refrigerant Pressure Sensor / Switch: Service and Repair
REPLACEMENT
1. Disconnect the negative (-) battery terminal.
2. Recover the refrigerant with a recovery/charging station.
3. Disconnect A/C pressure transducer connector (A) and then remove the A/C pressure transducer (B).
WARNING:
Take care that liquid & suction pipe are not bent.
4. Installation is the reverse order of removal.
TORQUE: 10 - 12N.m (1.0 - 1.2kgf.m, 7.4 - 8.8lbf.ft)