Heated Glass Element Relay: Testing and Inspection
WINDSHIELD DEICER RELAYINSPECTION
1. In state of IGN1 SW ON, after ALT "L" is ON and then DEICER SW is ON, ON the output of DEFOGGER for 20 min. (operate in state of ENGINE RUNNING)
2. During DEICER output ON, when DEICER SW is ON, OFF the output DEICER.
3. During DEICER output ON, when ALT "L" is OFF or IGN1 SW is OFF, OFF the output of DEICER.
4. The decision of inputting ALT "L" shall be complied with the table.
5. In state of DEICER SW ON, When ALT "L" is ON Then DEICER RLY don't output.