Shift Rail: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
1ST-2ND Shift Rail | 6.5 | 5.9 | B | Includes: R&I Transaxle. |
NOTE | ||||
With Power Steering, Add | 0.4 | 0.0 | B | |
3RD-4TH Shift Rail | 6.5 | 5.9 | B | Includes: R&I Transaxle. |
NOTE | ||||
With Power Steering, Add | 0.4 | 0.0 | B |