Starter Relay: Testing and Inspection
STARTER RELAYINSPECTION
1. Remove the fuse box cover.
2. Remove the starter relay.
3. Using an ohm meter, check that there is continuity between each terminal.
Terminal Continuity
30 - 87 NO
85 - 86 YES
4. Apply 12 V to terminal 85 and ground to terminal 86. Check for continuity between terminals 30 and 87.
5. If there is no continuity, replace the starter relay.
6. Install the starter relay.
7. Install the fuse box cover.