Power Door Lock Relay: Testing and Inspection
POWER DOOR LOCK RELAYINSPECTION
1. Remove the door lock/unlock relay from the junction box.
2. Check for continuity between the terminals.
3. There should be continuity between the No. 1 and No. 2 terminals when power and ground are connected to the No. 3 and No. 5 terminals.
4. There should be continuity between the No. 1 and No. 4 terminals when power is disconnected.