FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Power Window Relay: Testing and Inspection

POWER WINDOW RELAY INSPECTION


Check for continuity between the terminals.

1. There should be continuity between the No.30 and No.87 terminals when power and ground are connected to the No.85 and No.86 terminals.




2. There should be no continuity between the No.30 and No.87 terminals when power is disconnected.