Power Transistor HVAC: Testing and Inspection
CHECK (AUTO CONTROL)1. Manually operate the control switch and measure the voltage of blower motor between pin 1 and 2.
2. Select the control switch to raise voltage until high relay operates.
CHECK
Tolerance: ± 0.5 V