Evaporative Emission Control Canister: Testing and Inspection
Inspection1. Visually check for damage and replace if necessary.
Inspection
1. Measure canister close valve resistance.
Resistance: Approximately 26 ohms at 68 °F (20 °C)
2. If not as specified, replace the canister close valve.