Throttle Valve Solenoid: Testing and Inspection
RESISTANCE INSPECTION1. Disconnect negative battery cable.
2. Disconnect solenoid valve connector.
3. Measure resistance between ground terminals and of connector C145.
Resistance: 4.1 - 5.1 ohms
4. If not correct, check wiring for an open or short circuit, replace pressure control valve.
5. Connect solenoid valve connector.
6. Connect negative battery cable.