System Relay: Testing and Inspection
Inspection1. Disconnect the A/C relay connector.
2. Check continuity between terminals.
3. If not as specified, replace the relay.
4. If correct, go to next step.
5. Apply 12 V to terminal 5 and ground terminal 1.
6. Check for continuity between terminals 2 and 3.
7. If not as specified, replace the relay.