FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder8.05.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
All Cylinders9.87.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Add the Following If Performed With Piston & Ring Jobs
Main Bearings, Renew5.60.0A
Oil Pump, Renew1.30.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.60.0A
Timing Belt, Renew0.80.0A
Camshaft, Renew1.20.0A
Tune-Up0.50.0A