Installation - Front
INSTALLATION
NOTE: LHD model shown. RHD model similar.
1. Position the blower motor resistor (3) into the HVAC housing (5).
2. Install the two screws (4) that secure the blower motor resistor to the HVAC housing. Tighten the screws to 2 Nm (17 in. lbs.).
3. Connect the wire harness connector (2) to the blower motor resistor and engage the wire harness connector locking tab (1).
4. Install the glove box into the instrument panel Instrument Panel Glove Box - Installation.
5. Reconnect the negative battery cable.