Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add the Following If Performed With Piston & Ring Jobs
Main Bearings, Renew4.90.0A
Crankshaft, Renew4.90.0A
Oil Pump, Renew1.60.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew2.90.0A
Timing Chain, Renew1.80.0A
Tune-Up0.50.0A
All Connecting Rods
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Right Bank10.87.5AIncludes: R&R Cylinder Head R&R Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.4AIncludes: R&R Cylinder Head R&R Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks12.79.0AIncludes: R&R Cylinder Head R&R Oil Pan, Hone Cylinder Walls And Plastigage Bearings.