FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod Bearing: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace11.88.4AIncludes: R&R Engine On TrooperII Models Only. R&R Oil Pan, Plastigage Bearings & Make All Necessary Adjustments.
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Main & Rod Bearings13.79.7AIncludes: R&R Engine & Oil Pan, Plastigage Bearings And Make All Necessary Adjustments.
Note
With AC, Add0.40.2A
With PS, Add0.40.2A