FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Shift Solenoid Relay: Testing and Inspection





A/T CONTROL RELAY CHECK
1. Remove the A/T control relay.
2. Use jumper wires to connect A/T control relay terminal 2 to the battery (+) terminal and terminal 4 to the battery (-) terminal.
3. Check the continuity between terminal 1 and terminal 3 of the A/T control relay when the jumper wires are connected and disconnected from the battery.
4. If there is a problem, replace the A/T control relay.