Battery Visual Inspection (1)
1. Checking flow
Checking Sheet:
2. Checking Sheet
3. Load Test
1. When discharge the battery during 15 seconds at half currency of C.C.P, the voltage of battery should over the voltage as shown.
2. When the voltage is not within specification, test 2nd load test again, and if not, do the re-charge.
3. If the battery voltage (left alone within 2 hours after recharging) is over 12.5 V and the voltage after load test is over the standard value, this battery can be used.