FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Cranking Signal: Testing and Inspection

INSPECTION

PGM-FI ECM Connector Description And Wire Location:





1. Install the test harness between the Programmed Fuel Injection Electronic Control Module (PGM-FI ECM) and the harness.
2. Measure for battery voltage between terminals B9(+) and A26(-) when the ignition switch is turned to the start position.
3. If no voltage is measured, check the No. 2 Starter Signal fuse located in the under-dash fuse/relay box.
4. If fuse tests ok repair BLUE/RED wire between PGM-FI ECM and Starter Signal fuse as needed.