Blower Motor Relay: Testing and Inspection
Heater Relay Pinout Test:
^ There should be continuity between the C and D terminals.
^ There should be continuity between the A and B terminals when power and ground are connected to the C and D terminals.
^ There should be no continuity when power is disconnected.