Condenser Fan Motor Relay: Testing and Inspection
A/C Relay Test:
- There should be continuity between the C and D terminals.
- There should be continuity between the A and B terminals when power and ground are connected to the C and D terminals.
- There should be no continuity when power is disconnected.