Installation - Front
INSTALLATION
1. Position the blower motor resistor (1) into the HVAC housing (2).
2. Rotate the blower motor resistor clockwise until it is fully seated in the HVAC housing. Make sure the resistor is fully engaged to the housing.
3. Connect the wire harness connector (3) to the blower motor resistor.
4. Install the glove box .
5. Reconnect the negative battery cable.