Test E: The Demand Lamps Are Inoperative
PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVEE1:
Normal Operation
The smart junction box (SJB) provides voltage to the demand lamps through circuit 53 (BK/LB). Ground for the demand lamps is provided through circuit 1205 (BK).
Possible Causes
- Circuit 1205 (BK) open
- Interior lamp