Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One
Right Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.38.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
All, Both Banks18.913.5A
Note
With AC, Add0.70.4A
One, Each Bank14.310.2A
Note
With AC, Add0.70.4A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.00.0A
Crankshaft, Renew
Manual Trans4.90.0A
Auto Trans4.70.0A
Oil Pump, Renew1.30.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain or Gears, Renew1.40.0A
Tune-Up0.70.0A