| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Oil Leak, Diagnosis | 1.0 | 0.0 | C | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 16.7 | 16.1 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| NOTE |
| With Dual Alternators, Add | 0.4 | 0.3 | B | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | B | |
| Complete Assembly With Transfer Of Parts | 19.7 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units. Does not Include Transfer Of Optional Equipment. |
| NOTE |
| With Dual Alternators, Add | 0.4 | 0.0 | B | |
| With Frame Mounted Battery, Add | 0.2 | 0.0 | B | |
| Long Block | 24.7 | 0.0 | B | Includes: R&I Engine & Transfer All Necessary Components Not Supplied With Long Block. |
| NOTE |
| With Frame Mounted Battery, Add | 0.2 | 0.0 | B | |
| With Dual Alternators, Add | 0.4 | 0.0 | B | |
| Short Block | 27.7 | 24.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| NOTE |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | B | |
| To Grind Valves, Add |
| One Bank | 5.0 | 4.0 | B | |
| Both Banks | 9.4 | 7.8 | B | |
| With Dual Alternators, Add | 0.4 | 0.3 | B | |
| Overhaul/Rebuild | 39.2 | 0.0 | A | Includes: Disassemble & Clean Engine. Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves & Tune-Up. |
| NOTE |
| With Frame Mounted Battery, Add | 0.2 | 0.0 | A | |
| With Dual Alternators, Add | 0.4 | 0.0 | A | |