Drive/Propeller Shaft: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Front Axle | 0.8 | 0.4 | C | |
| NOTE | ||||
| To R&R U-Joints, Add | ||||
| Two Piece Driveshaft | ||||
| Front | 0.6 | 0.5 | C | |
| Rear | ||||
| Without Double Cardan | 0.6 | 0.5 | C | |
| With Double Cardan | 1.0 | 0.8 | C | |
| To R&R Center Support Bearing, Add | 0.6 | 0.5 | C | |
| Rear Axle | 0.5 | 0.4 | C | |
| NOTE | ||||
| To R&R Center Support Bearing, Add | 0.6 | 0.5 | C | |
| To R&R U-Joints, Add | ||||
| Two Piece Driveshaft | ||||
| Front | ||||
| Without Double Cardan | 0.6 | 0.5 | C | |
| With Double Cardan | 0.8 | 0.7 | C | |
| Rear | 0.6 | 0.5 | C | |
| Center | ||||
| Without Double Cardan | 0.6 | 0.5 | C | |
| With Double Cardan | 0.8 | 0.7 | C |