|  | Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | 
| Diagnose/Test | 
| Oil Leak, Diagnosis | 1.0 | 0.5 | C |  | 
| Replace | 
| Complete Assembly Without Transfer Of Parts | 11.1 | 7.8 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. | 
| Complete Assembly With Transfer Of Parts | 13.9 | 11.2 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include: Transfer Of Optional Equipment. | 
| Long Block | 17.6 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. | 
| Short Block | 20.6 | 14.5 | A | Includes: R&R Engine And Replacement Of Necessary Components. | 
| NOTE | 
| To Grind Valves, Add | 
| One Bank | 2.3 | 1.9 | A |  | 
| Both Banks | 4.4 | 3.7 | A |  | 
| Overhaul/Rebuild | 30.6 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves & Tune-Up |