Information Bus
Description and Operation
Testing and Inspection
- Initial Inspection and Diagnostic Overview
 - Symptom Related Diagnostic Procedures
 - Pinpoint Tests
- Module Communications Network
- Pinpoint Test PC (Precheck)
 - Test A: 4WABS Control Module Does Not Respond to Diagnostic Tool
 - Test B: GEM/CTM Module Does Not Respond to the Scan Tool
 - Test C: RCM Does Not Respond to Scan Tool
 - Test D: RAP Module Does Not Respond to the Scan Tool
 - Test E: PCM Does Not Respond to the Diagnostic Tool
 - Test F: Air Suspension Control Module No Response
 - Test G: EATC Module No Response
 - Test H: DSM No Response
 - Test I: PAM No Response
 - Test J: PATS Module No Response
 - Test K: No Module/Network Communication - ISO 9141 Network
 - Test L: No Module/Network Communication - SCP Network
 - Test M: No Module/Network Communication - No Power to Scan Tool
 
 - Module Configuration
 
 - Module Communications Network
 - Scan Tool Testing and Procedures
 
Locations
Service and Repair
Diagrams
Specifications
Tools and Equipment