| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Oil Leak, Diagnosis | 1.0 | 0.6 | C | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 9.5 | 6.4 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Note |
| With AC, Add | 1.6 | 0.9 | B | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | B | |
| Complete Assembly With Transfer Of Parts | 11.6 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units. Does not Include Transfer Of Optional Equipment. |
| Note |
| With AC, Add | 1.6 | 0.9 | B | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | B | |
| Long Block | 16.7 | 0.0 | B | Includes: R&I Engine & Transfer All Necessary Components Not Supplied With Long Block. |
| Note |
| With AC, Add | 1.6 | 0.9 | B | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | B | |
| Short Block | 19.6 | 0.0 | A | Includes: R&I Engine And Replacement Of All Necessary Parts. |
| Note |
| With AC, Add | 1.6 | 0.9 | A | |
| To Grind Valves, Add | 5.6 | 4.7 | A | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | A | |
| Overhaul/Rebuild | 30.2 | 0.0 | A | Includes: Disassemble & Clean Engine. Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves & Tune-Up. |
| Note |
| With AC, Add | 1.6 | 0.9 | A | |
| With Frame Mounted Battery, Add | 0.2 | 0.1 | A | |