FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional1.10.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.40.2A
To Grind Valves, Add
One CYL0.70.4A
All Cyls4.93.5A
To Renew Main Bearings, Add2.90.0A
To Renew Oil Pump, Add2.00.0A
To Clean Oil Pump Screen, Add0.20.0A
To Renew Rear Main Oil Seal, Add
Manual Transaxle1.50.0A
Auto Transaxle1.80.0A
To Renew Timing Belt, Add1.40.0A
With Turbo, Add0.90.6A
To Replace Cylinder Head, Add2.92.1A
To Perform Tune Up, Add0.50.0A
One CYL10.87.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.