FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL11.78.3AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.10.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew2.90.0A
Crankshaft, Renew3.10.0A
Oil Pump, Renew2.00.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Transaxle1.50.0A
Auto Transaxle1.80.0A
Timing Belt, Renew1.40.0A
Tune-Up0.50.0A
Note
With AC, Add0.40.2A
To Replace Cylinder Head, Add2.92.1A
To Grind Valves, Add
One CYL0.70.4A
All Cyls4.93.5A