FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod Bearing: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One2.82.0AIncludes: R&R Oil Pan & Plastigage Bearings.
Each Additional0.50.3AIncludes: R&R Oil Pan & Plastigage Bearings.
Note
With AC, Add0.40.2A
To Replace Oil Pump, Add2.01.4A
Main & Rod Bearings13.49.5AIncludes: R&R Engine & Oil Pan. Plastigage Bearings.
Note
With AC, Add0.50.3A
With PS, Add0.40.2A
With Auto Trans, Add0.50.3A
To Replace Oil Pump, Add2.01.4A