Installation
INSTALLATION
1. Position the after run pump (2) onto the mounting bracket (3).
2. Connect the two coolant hoses (4) to the after run pump (2).
3. Connect the after run pump electrical connector (1).
4. Install the air cleaner housingAir Cleaner Body - Installation.
5. Install the negative battery cable.
6. Fill the cooling system Service and Repair