Installation
2.7L
1. Install generator.
2. Install upper bolt mounting bolt.
3. Install 2 lower mounting bolts.
4. Tighten bolts to 65 Nm (48 ft. lbs.).
5. Install B+ terminal nut and wire. Tighten nut to 13 Nm (115 in. lbs.).
6. Connect generator field circuit plug.
7. Install generator drive belt.
8. Connect negative battery cable.