Crankshaft: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | 11.8 | 8.1 | A | Includes: Replace Rod Bearings And Main Bearings. |
| NOTE | ||||
| To R&R Oil Pump, Add | 0.2 | 0.2 | A | |
| To R&I Cylinder Heads, Add | ||||
| One Bank | 1.6 | 1.3 | A | |
| Both Banks | 2.3 | 1.9 | A | |
| To R&R Cylinder Head, Add | ||||
| One Bank | 2.3 | 1.9 | A | |
| Both Banks | 3.8 | 3.0 | A | |
| To Grind Valves, Add | ||||
| All Cyls | 3.4 | 2.8 | A | |
| To R&R Piston Rings, Add | 3.0 | 2.5 | A | |
| To R&R Piston, Add | ||||
| One | 0.4 | 0.3 | A |